On March 23, it was learned from Jinxi Petrochemical that since the water heating transformation project of the Dongyoupin facilitys Liaohe tank farm was put into operation one and a half months ago,
View details
On March 24th, at the construction sites of the 1 million kilowatt wind power project in Turpan Shanshan and the 1 million kilowatt photovoltaic project in Shanshan East of the Tuha Oilfield,
View details
Lanzhou Petrochemical Company has successfully solved the problem of processing high-sulfur crude oil by means of precise scientific "formulas", providing support for improving resource processing efficiency and optimizing raw material structure.
View details
On March 5th, at the site of Well Wawa 38-39-K033CH in Jinhai Oil Production Plant of Liaohe Oilfield, after the application of the gravel packing technology, the well successfully overcame the long-term sand production problem and achieved a
View details
Just after the Spring Festival, good news came from the production frontline of Changqing Oilfield: As of February 21, the oil and gas production equivalent of Changqing Oilfield in 2026
View details
On January 23, the author learned that the Jilantai Oilfield of the Bayan Branch of Huabei Oilfield has continuously deepened the efficient development management model of old oilfields,
View details
On January 5th, a reporter learned from the Oil and Gas Technology Research Institute of Jilin Oilfield that the Jilin Oilfields intensive overall fracturing technology has focused on the capacity
View details
On December 22, the author learned that the high-temperature heat pump system of the third thermal station, a key supporting project for the western transformation and upgrading of Jilin Petrochemical, was successfully put into operation.
View details
As of December 21, the Tarim Oilfield has put 113 new wells into production this year, with a new crude oil production capacity of 1.0923 million tons and a natural gas production capacity of 2.234 billion cubic meters.
View details