The water heating transformation project of Jinxi Petrochemical has enhanced the comprehensive utilization efficiency of energy.

2026-04-03

On March 23, it was learned from Jinxi Petrochemical that since the water heating transformation project of the Dongyoupin facilitys Liaohe tank farm was put into operation one and a half months ago,

View details

The Tuha Oilfield is accelerating efforts to advance its one million kilowatt-level new energy project.

2026-03-27

On March 24th, at the construction sites of the 1 million kilowatt wind power project in Turpan Shanshan and the 1 million kilowatt photovoltaic project in Shanshan East of the Tuha Oilfield,

View details

Lanzhou Petrochemical Company has successfully solved the problem of processing high-sulfur crude oil.

2026-03-20

Lanzhou Petrochemical Company has successfully solved the problem of processing high-sulfur crude oil by means of precise scientific "formulas", providing support for improving resource processing efficiency and optimizing raw material structure.

View details

The Jinhai Oil Production Plant of Liaohe Oilfield has solved the sand production problem through an integrated process.

2026-03-13

On March 5th, at the site of Well Wawa 38-39-K033CH in Jinhai Oil Production Plant of Liaohe Oilfield, after the application of the gravel packing technology, the well successfully overcame the long-term sand production problem and achieved a

View details

The oil and gas equivalent production of Changqing Oilfield has rapidly exceeded 10 million tons.

2026-03-06

​Just after the Spring Festival, good news came from the production frontline of Changqing Oilfield: As of February 21, the oil and gas production equivalent of Changqing Oilfield in 2026

View details

The Jilantai Oilfield of Huabei Oilfield Company has driven the efficient development of the old oilfield through innovation.

2026-02-06

On January 23, the author learned that the Jilantai Oilfield of the Bayan Branch of Huabei Oilfield has continuously deepened the efficient development management model of old oilfields,

View details

The first trial of the electric pump fishing-uplift technology in the Tarim Oilfield was a success.

2026-01-23

View details

The intensive overall fracturing technology of Jilin Oilfield has enabled the old oilfield to achieve new energy production.

2026-01-09

​On January 5th, a reporter learned from the Oil and Gas Technology Research Institute of Jilin Oilfield that the Jilin Oilfields intensive overall fracturing technology has focused on the capacity

View details

The high-temperature heat pump system of Jilin Petrochemical Company has achieved remarkable energy-saving effects.

2026-01-02

On December 22, the author learned that the high-temperature heat pump system of the third thermal station, a key supporting project for the western transformation and upgrading of Jilin Petrochemical, was successfully put into operation.

View details

The Tarim Oilfield has put more than 100 new wells into production this year.

2025-12-26

​As of December 21, the Tarim Oilfield has put 113 new wells into production this year, with a new crude oil production capacity of 1.0923 million tons and a natural gas production capacity of 2.234 billion cubic meters.

View details