The construction of long-distance oil and gas pipelines in China has entered the era of "all-terrain automatic welding"

2025-04-18

​On April 8th, the "Four-All" pipeline welding inspection robot technology equipment system independently developed by our country was put into

View details

A scientific and technological achievement of Southwest Oil and Gas Field Company has reached the international advanced level

2025-03-28

View details

The CBM production of Huabei oilfield continues to rise strongly

2025-03-14

​In February, the daily production of coalbed methane in Qinshui coalbed methane field of Huabei Oilfield continued to maintain a high operating state of more than 7.2 million cubic meters.

View details

The 21st Tianjin Industry Fair 2025 intelligent pump valve exhibition

2025-03-07

The 21st Tianjin Industry Expo (CIEX) will be held at the National Convention and Exhibition Center (Tianjin) from March 6 to 9.

View details

China's first offshore gas storage facility officially put into operation!

2025-02-14

​At 13:00 today, with the issuance of gas production instructions, the production valve of Nanpu No. 1 gas storage well of Jidong Oilfield Branch of petrochina Co., LTD.,

View details

Yumen oilfield has entered the era of "pipeline natural gas transmission"

2025-01-10

​At 15:58 on November 12, with the opening of the last valve room No. 2 of Qinggao Line (Qing1 gas collection Station to Gaoshawo), natural gas in Ningqing block of Yumen Oilfield

View details

Profitable oil is produced from rock joint in Tuha oilfield

2024-12-27

View details

The first gas storage group in Northwest China realizes the same production

2024-12-13

View details

To build a new model of low-carbon and efficient surface system in Dagang Oilfield

2024-11-29

On August 22, the oil and gas produced by the oil Wells under the supervision of Wangxuzhuang Oilfield in Dagang was directly transported to the joint station

View details

Changqing Oilfield: Light up "Science and technology Tree" for winter supply "gas storage"

2024-11-15

As of October 31, 1,750 Wells had been drilled and 997 Wells had been put into operation in the production capacity construction of the self-operating area of Changqing Gas field

View details